News
Keep up to date with our latest news and project updates below
Southampton Row London Before & After.
Southampton Row London Before & After. Back in 2015/16 VariBlast Ltd cleaned the Portland stone facade of this iconic building, No.4 Southampton Row, London. As you can see the Before & After…
8th August 2018St Pancras Train Station, London
St.Pancras Train Station, London. They don’t build them like this anymore! A truly spectacular building just across the road from one of our current projects, the previously known ‘Camden Town Hall’ Building,…
8th August 2018This weather.
This weather. Even in this ‘overwhelming’ heat, our teams are pushing at the same rate of programme & high standards of work we are used to producing on site! (Even if they…
7th August 2018Southampton Row London.
Southampton Row London. Another throw back Thursday project revisited yesterday whilst doing the rounds.. Back in 2015/16 VariBlast Ltd wet abrasive blast cleaned the Portland stone facade of this fantastic historical building,…
3rd August 2018Herbal House London.
Herbal House London. Another blast from the past! Back in 2015 VariBlast Ltd were awarded the contract to wetblast remove 15,000+m2 of lead contained paint from internal concrete soffits, beams, walls and…
3rd August 2018Royal Mail Mount Pleasant.
Royal Mail Mount Pleasant. What a ‘Blast’ from the passed seeing this old girl yesterday! Back in 2012 VariBlast Ltd won the contract to Abrasive Blast and Tensid strip back the existing…
3rd August 2018Have I missed a bit?
Have I missed a bit?.. St3 & St2 surface preparation from above! Working upon the roof of the Birmingham Bullring Shopping Centre, VariBlast Ltd are carrying out surface preparation & coating works…
3rd August 2018St3 & St2 surface preparation at height!
St3 & St2 surface preparation at height! Working upon the roof of the Birmingham Bullring Shopping Centre, VariBlast Ltd are carrying out surface preparation & coating works to all external structural steels…
3rd August 2018Week 1 – Bullring Birmingham full roof redecorate.
Week 1 – Bullring Birmingham full roof redecorate. Surface prep (st3) and three coat Sherwin Williams paint system (C88 & C237v2 ?).. looking good lads!
20th July 2018To think that at one point it was considered to be more ‘cost effective’ to tear this beautiful 52,000 2ft World War 2 (type C) hanger down and start again!
To think that at one point it was considered to be more ‘cost effective’ to tear this beautiful 52,000 2ft World War 2 (type C) hanger down and start again! I’m so…
12th July 2018
Recent Posts
- New Talent
- Supporting Industry Publications
- On Site With VariBlast
- 25 North Colonnade
- Constructionline Gold
- Peter’s Anniversary
- War memorial gets a clean-up for Remembrance Sunday
- VariBlast’s ‘Giving Back’ War Memorial cleaning campaign, in preparation for Remembrance Day, has been an absolute success!
- Another central London blasting project started back in September this year.
- Works are well underway within this World War ll Type T2 aircraft hangar.