Case Study: Southbank, Queen Elizabeth Hall, Riverbank, London

Posted on April 15, 2017

Client: Cemplas/BAM Construction
Project/Case Study: Southbank, Queen Elizabeth Hall, Riverbank, London
Duration: 3 months
The Brief: Removal of carbon deposits, heavy surface dirt and grime build-up from bare faced cast concrete within the Queen Elizabeth Hall and external “Artists Bar” area.
Services used: Combination of wet blasting and olivine blastingDOFF cleaning

Video:

 

Photos:

Trusted by