Haltermann Carless – External Works 2017

Working to a ‘Sherwin-Williams’ paint specification, VariBlast Ltd were employed to carry out a full re-decoration of four large roof trusses situated above the ‘Bullring’ shopping centre in central Birmingham.

Working in such a high footfall location (35 to 40 thousand people per day) presented its challenges when operating such large machinery.

The works included; St3 Hand & Power Tool surface preparation, followed by a solvent clean and three coat paint system. All works were carried out by hand at an average working height of 15 to 20m above ground level, via 120ft MEWP access.

Download

Location:

  • Harwich

Client:

  • Haltermann Carless

Principal Contractor:

  • VariBlast Ltd

Duration:

  • 21 weeks

Completion Date

  • November 2017

Value:

  • £120,000.00p

Services Used:

  • HOT Wash Cleaning
  • St3 Hand Preparation
  • Spot Sa2.5 DRY Blasting