Middleton Stop Pump

Repainting water intake zones

Middleton Stop Pump

VariBlast were contracted by the Water Management Alliance to carry out works on the Middleton Stop Pumping Station, in order to prepare and redecorate 295m² of external steel sheet piling, within the two intake chambers.

All areas were dry blast cleaned to a preparation level of Sa 2.5, prior to the application of a new Sherwin Williams paint system, applied using the airless spray pump application method.

Download

Location:

  • Kings Lynn

Client:

  • Water Management Alliance

Principal Contractor:

  • VariBlast Ltd

Duration:

  • 2 Weeks

Completion Date:

  • October 2016

Services Used:

  • Dry Blast Cleaning
  • Airless Spray Painting

Materials Used:

  • Sherwin Williams Paints