Happisburgh Lighthouse

VariBlast Ltd were asked by Happisburgh Lighthouse Trust to remove all measured areas of existing internal missionary paint coatings from all measured stone and concrete staircase soffits and step edging.

The works were carried out with low pressure dry blasting techniques to ensure that no damage or de-facing of the existing substructure occurred.

Download

Location:

  • Happisburgh, Norfolk

Client:

  • Happisburgh Lighthouse Trust

Principal Contractor:

  • VariBlast Ltd

Duration:

  • 3 Weeks

Completion Date:

  • December 2015

Value:

  • £27,000.00p

Services Used:

  • Low Pressure Dry Blasting

Materials Used:

  • Olivine Blast Media