VariBlast were contracted by EPRL to attend Eye Power Station in Suffolk to carry out confined-space dry blast cleaning services within internal areas of both the furnace and ash hoppers there.
All measured areas were to be blast cleaned to an Sa 2.5 specification, followed by the application of a heat tolerant paint system called Interplus 256, manufactured by International Paints.
Location:
- Eye, Suffolk
Client:
- EPRL
Principal Contractor:
- VariBlast Ltd
Duration:
- 3 Weeks
Completion Date:
- August 2014
Services Used:
- Dry Blasting
- Airless Spray Painting
Materials Used:
- Olivine Blast Media